08037
98-room ETAP hotel
Location: Vallecas, Madrid. Spain Date: 2008 Client: AR Arquitectos Area / Length: 4600 m² Global budget: € 2,396,600 Budget of the tasks undertaken: € 542,690
Tasks undertaken: Basic Engineering, Detail Engineering Technical areas: Structural Engineering Areas of action: Residential and Hotel buildings