• A30 Highway in Montreal. 
Toll plaza marquee structure review 20798
  • A30 Highway in Montreal. 
Toll plaza marquee structure review 20800
  • A30 Highway in Montreal. 
Toll plaza marquee structure review 20802
  • A30 Highway in Montreal. 
Toll plaza marquee structure review 20804
  • A30 Highway in Montreal. 
Toll plaza marquee structure review 20806
  • A30 Highway in Montreal. 
Toll plaza marquee structure review 20808
10016-B

A30 Highway in Montreal. Toll plaza marquee structure review

Location: Montreal. Canada Date: 2012 Client: UTE A30CVJ ACCIONA + DRAGADOS Area / Length: 5835 m² Global budget: € 1,200,000,000 Budget of the tasks undertaken: € 390,000
Tasks undertaken: Detail Engineering, Technical assistance on contruction works, Project Review, Studies and Reports, Recalculation and expert evaluation Technical areas: Civil engineering Areas of action: Infraestructure and Civil Works, International Projects

The new A30 highway in Montreal has 43 km of new roads with a budget of approximately can$ 1,6 billion. The execution of a toll station is scheduled and consists in an administrative building, a steel marquee over a concrete foundation slab and some driveways.
3D3 INGENIERÍA has done a technical assistance during the execution of the works. Some of the jobs are the following:
– Evaluation of the steel marquee project and new constructive proposal to optimize the cost and, above all, the execution time, to allow meeting tight deadlines
– Evaluation of workshop and assembly drawings previously to the beginning of the manufacturing process of the steel structure to detect errors and ommisions, to give the permission for the construction.
All works are done according to the Canadian Standards, in English or French according to the requirements of the client.

Other projects