Cybernetic laboratory building at the university of León

Location: León. Spain Date: 2014 Client: EDHINOR Area / Length: 5000 m² Global budget: € 2,705,000 Budget of the tasks undertaken: € 1,250,000
Tasks undertaken: Project Review, Recalculation and expert evaluation Technical areas: MEP Engineering Areas of action: Singular works, Education and Health

Edhinor, construction company, hires 3D3 INGENIERIA for the optimization of the MEP System for the building that will house the Cibernetic Laboratories of the University of Leon in Spain
The scope of the work to be performed is as follows:
– Complete calculation of thermal loads adapted to Spanish regulation including analysis and feasibility study of the improvements proposed by the Edhinor in order to improve the building energy eficiency.
– Plumbing and hot water system
– Installation of air conditioning and ventilation: comprehensive study of climate control system with air-to-air systems and VRV units depending on the conditions of use.
– Installation of low voltage electricity (lighting and power)
– Installation of medium voltage electricity (Transformer)
– Installation of Lighting: Complete lighting calculation of the new simplified installation and lighting control.
– Fire protection system
– Review of LAN Network system
– Review of PA system, CCTV, CCAA and security.