The building, promoted by SERVICAIXA and designed by Carmen Pinós Architecture bureau , will house 107 apartments, 8 commercial spaces on the ground floor and two basements for parking.
3D3 INGENIERIA is responsible for the design of the building the following installations:
– Installation of plumbing and hot water generation using solar energy.
– Sanitation and drainage
– Swimming pools.
– HVAC Systems.
– Gas supply.
– Telecommunications.
– Garage air extraction.
– Low Voltage Electrical installation.
– Lightning protection and grounding
– Study of energy efficiency of the building.
– Acoustic Study of the building.
15051
Residential building with 107 housing units
Location: Madrid. Spain Date: 2015 Client: Estudio Carme Pinós Area / Length: 22551 m² Global budget: € 13,735,081 Budget of the tasks undertaken: € 3,829,914
Tasks undertaken: Basic Engineering, Basic Engineering, Basic Engineering, Detail Engineering, Technical assistance on contruction works Technical areas: MEP Engineering Areas of action: Singular works, Residential and Hotel buildings